DESCRIPTION

The project required the supply of all labour, material and equipment required to carry out the construction of the CN Autoport Compound, Tripke Crown pavement replacement. The work included the protection of existing infrastructure and the construction of designed grades, slopes and ditches.

What is notable about this project was the coordination with CN Rail on a daily basis to ensure project fluidity and the maintenance of normal operations.

OTHER PROJECTS

START YOUR PROJECT

Our experienced team at Fermar are ready to understand your project objectives and bring your vision to life.

Contact us now